Triple

T18353538
Position Surface form Disambiguated ID Type / Status
Subject Carrick-on-Suir E439729 entity
Predicate railwayLine P848 FINISHED
Object Limerick–Waterford railway line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Limerick–Waterford railway line | Statement: [Carrick-on-Suir, railwayLine, Limerick–Waterford railway line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Limerick–Waterford railway line
Context triple: [Carrick-on-Suir, railwayLine, Limerick–Waterford railway line]
  • A. Limerick–Ennis railway line
    The Limerick–Ennis railway line is a regional rail route in western Ireland connecting the cities of Limerick and Ennis as part of the broader Limerick–Galway corridor.
  • B. Cork–Cobh railway line
    The Cork–Cobh railway line is a suburban rail route in County Cork, Ireland, linking Cork city with the port town of Cobh and serving as part of the region’s commuter rail network.
  • C. Dublin to Cork railway line
    The Dublin to Cork railway line is a major intercity rail route in Ireland that connects the capital city Dublin with Cork, passing through several key towns and cities along the way.
  • D. Cork–Midleton railway line
    The Cork–Midleton railway line is a suburban rail route in County Cork, Ireland, linking Cork city with the town of Midleton as part of the region’s commuter rail network.
  • E. Dublin–Westport railway line
    The Dublin–Westport railway line is a major intercity rail route in Ireland linking Dublin with the town of Westport in County Mayo, serving as a key passenger corridor across the country.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Limerick–Waterford railway line
Target entity description: The Limerick–Waterford railway line is a regional rail route in Ireland that historically connected the cities of Limerick and Waterford via several intermediate towns in the south of the country.
  • A. Limerick–Ennis railway line
    The Limerick–Ennis railway line is a regional rail route in western Ireland connecting the cities of Limerick and Ennis as part of the broader Limerick–Galway corridor.
  • B. Cork–Cobh railway line
    The Cork–Cobh railway line is a suburban rail route in County Cork, Ireland, linking Cork city with the port town of Cobh and serving as part of the region’s commuter rail network.
  • C. Dublin to Cork railway line
    The Dublin to Cork railway line is a major intercity rail route in Ireland that connects the capital city Dublin with Cork, passing through several key towns and cities along the way.
  • D. Cork–Midleton railway line
    The Cork–Midleton railway line is a suburban rail route in County Cork, Ireland, linking Cork city with the town of Midleton as part of the region’s commuter rail network.
  • E. Dublin–Westport railway line
    The Dublin–Westport railway line is a major intercity rail route in Ireland linking Dublin with the town of Westport in County Mayo, serving as a key passenger corridor across the country.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b918221c8190a9f7b563d64ac677 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e516d37bc08190abc9b4e8c937c914 completed April 19, 2026, 5:54 p.m.
Created at: April 10, 2026, 10:37 a.m.