Triple

T18339521
Position Surface form Disambiguated ID Type / Status
Subject Dworshak Dam E439362 entity
Predicate hasPowerPlant P9904 FINISHED
Object Dworshak Powerplant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dworshak Powerplant | Statement: [Dworshak Dam, hasPowerPlant, Dworshak Powerplant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dworshak Powerplant
Context triple: [Dworshak Dam, hasPowerPlant, Dworshak Powerplant]
  • A. Narrows Hydroelectric Plant
    The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
  • B. Dworshak Dam
    Dworshak Dam is a large concrete gravity dam on the North Fork Clearwater River in Idaho, primarily used for hydroelectric power generation, flood control, and recreation.
  • C. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • D. John Day Dam
    John Day Dam is a large hydroelectric dam on the Columbia River in the Pacific Northwest, known for its significant power generation capacity and role in regional navigation and water management.
  • E. Bonneville Dam
    Bonneville Dam is a major hydroelectric and navigation dam on the Columbia River in the Pacific Northwest, known for power generation, fish ladders, and its role in regional river management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Dworshak Powerplant
Target entity description: Dworshak Powerplant is a hydroelectric generating facility located at the base of Dworshak Dam in Idaho, producing renewable power from the dam’s reservoir outflows.
  • A. Narrows Hydroelectric Plant
    The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
  • B. Dworshak Dam chosen
    Dworshak Dam is a large concrete gravity dam on the North Fork Clearwater River in Idaho, primarily used for hydroelectric power generation, flood control, and recreation.
  • C. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • D. John Day Dam
    John Day Dam is a large hydroelectric dam on the Columbia River in the Pacific Northwest, known for its significant power generation capacity and role in regional navigation and water management.
  • E. Bonneville Dam
    Bonneville Dam is a major hydroelectric and navigation dam on the Columbia River in the Pacific Northwest, known for power generation, fish ladders, and its role in regional river management.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9175fec8190af865699b4e64d8c completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e50ed07db48190a15e957c96b1c5bf completed April 19, 2026, 5:20 p.m.
Created at: April 10, 2026, 10:37 a.m.