Triple
T18339521
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dworshak Dam |
E439362
|
entity |
| Predicate | hasPowerPlant |
P9904
|
FINISHED |
| Object | Dworshak Powerplant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dworshak Powerplant | Statement: [Dworshak Dam, hasPowerPlant, Dworshak Powerplant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Dworshak Powerplant Context triple: [Dworshak Dam, hasPowerPlant, Dworshak Powerplant]
-
A.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
-
B.
Dworshak Dam
Dworshak Dam is a large concrete gravity dam on the North Fork Clearwater River in Idaho, primarily used for hydroelectric power generation, flood control, and recreation.
-
C.
Leaburg Power Plant
Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
-
D.
John Day Dam
John Day Dam is a large hydroelectric dam on the Columbia River in the Pacific Northwest, known for its significant power generation capacity and role in regional navigation and water management.
-
E.
Bonneville Dam
Bonneville Dam is a major hydroelectric and navigation dam on the Columbia River in the Pacific Northwest, known for power generation, fish ladders, and its role in regional river management.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Dworshak Powerplant Target entity description: Dworshak Powerplant is a hydroelectric generating facility located at the base of Dworshak Dam in Idaho, producing renewable power from the dam’s reservoir outflows.
-
A.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
-
B.
Dworshak Dam
chosen
Dworshak Dam is a large concrete gravity dam on the North Fork Clearwater River in Idaho, primarily used for hydroelectric power generation, flood control, and recreation.
-
C.
Leaburg Power Plant
Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
-
D.
John Day Dam
John Day Dam is a large hydroelectric dam on the Columbia River in the Pacific Northwest, known for its significant power generation capacity and role in regional navigation and water management.
-
E.
Bonneville Dam
Bonneville Dam is a major hydroelectric and navigation dam on the Columbia River in the Pacific Northwest, known for power generation, fish ladders, and its role in regional river management.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9175fec8190af865699b4e64d8c |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e50ed07db48190a15e957c96b1c5bf |
completed | April 19, 2026, 5:20 p.m. |
Created at: April 10, 2026, 10:37 a.m.