Triple

T1833878
Position Surface form Disambiguated ID Type / Status
Subject Kistna River E41019 entity
Predicate dam P8736 FINISHED
Object Almatti Dam E33538 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Almatti Dam | Statement: [Kistna River, dam, Almatti Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Almatti Dam
Context triple: [Kistna River, dam, Almatti Dam]
  • A. Almatti Dam chosen
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • B. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • C. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • D. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • E. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88647f9388190909bc36e795bdaec completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69abb02540dc819081b19a09562139cd completed March 7, 2026, 4:57 a.m.
NED1 Entity disambiguation (via context triple) batch_69adc9b4b4f08190a0e5ad50de5c0ba8 completed March 8, 2026, 7:10 p.m.
Created at: March 4, 2026, 7:33 p.m.