Triple
T18260397
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teesside Park |
E437335
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shopping park |
C20975
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shopping park Context triple: [Teesside Park, instanceOf, shopping park]
-
A.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
B.
shopping area
A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
-
C.
shopping centre
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
D.
commercial park
chosen
A commercial park is a planned area of land developed with multiple business facilities—such as offices, retail spaces, and light industrial units—designed to support commercial activities within a cohesive, often landscaped environment.
-
E.
shopping street
A shopping street is a public thoroughfare lined with a variety of retail stores, services, and eateries designed for pedestrian access and commercial activity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b913351c8190932b6a426de04b41 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:34 a.m.