Triple
T18210276
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Soldiers and Sailors Lot |
E436012
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cemetery lot |
C134
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cemetery lot Context triple: [Soldiers and Sailors Lot, instanceOf, cemetery lot]
-
A.
cemetery
chosen
A cemetery is a designated outdoor area where the dead are buried or interred, often marked by gravestones, monuments, and pathways for visitors to mourn and remember.
-
B.
rural cemetery
A rural cemetery is a landscaped burial ground located outside urban centers, designed as a park-like setting that combines gravesites with natural scenery, winding paths, and contemplative open spaces.
-
C.
group of cemeteries
A group of cemeteries is a conceptual class representing a collection of distinct burial grounds that are related by location, administration, history, or shared characteristics and treated as a single aggregated entity.
-
D.
funerary garden
A funerary garden is a specially designed outdoor space that commemorates the dead through symbolic plantings, memorial structures, and contemplative areas for mourning and remembrance.
-
E.
cemetery operator
A cemetery operator is an entity responsible for managing, maintaining, and overseeing the daily operations, records, and services of a burial ground or memorial park.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b90dba6481908e119eb9aa4ca0cb |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:32 a.m.