Triple

T18169713
Position Surface form Disambiguated ID Type / Status
Subject Naharayim/Baqura area E434991 entity
Predicate hasHydroelectricPlantSite P65769 FINISHED
Object Naharayim power plant
The Naharayim power plant is a historic hydroelectric facility built in the 1930s at the confluence of the Jordan and Yarmouk rivers, once a major source of electricity for Mandatory Palestine and now a symbol of Israeli-Jordanian history and cooperation.
E1310043 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Naharayim power plant | Statement: [Naharayim/Baqura area, hasHydroelectricPlantSite, Naharayim power plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Naharayim power plant
Context triple: [Naharayim/Baqura area, hasHydroelectricPlantSite, Naharayim power plant]
  • A. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • B. Utanen power plant
    Utanen power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to the region’s renewable energy production.
  • C. Haditha Hydroelectric Power Station
    Haditha Hydroelectric Power Station is a major hydroelectric facility in Iraq that generates electricity using water from the Haditha Dam on the Euphrates River.
  • D. Dimona nuclear facility
    The Dimona nuclear facility is a highly secretive Israeli nuclear installation widely believed to be central to the country's undeclared nuclear weapons program.
  • E. Liapootah Power Station
    Liapootah Power Station is a hydroelectric power facility in Tasmania, Australia, that forms part of the state's extensive Derwent River power scheme.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Naharayim power plant
Triple: [Naharayim/Baqura area, hasHydroelectricPlantSite, Naharayim power plant]
Generated description
The Naharayim power plant is a historic hydroelectric facility built in the 1930s at the confluence of the Jordan and Yarmouk rivers, once a major source of electricity for Mandatory Palestine and now a symbol of Israeli-Jordanian history and cooperation.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Naharayim power plant
Target entity description: The Naharayim power plant is a historic hydroelectric facility built in the 1930s at the confluence of the Jordan and Yarmouk rivers, once a major source of electricity for Mandatory Palestine and now a symbol of Israeli-Jordanian history and cooperation.
  • A. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • B. Utanen power plant
    Utanen power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to the region’s renewable energy production.
  • C. Haditha Hydroelectric Power Station
    Haditha Hydroelectric Power Station is a major hydroelectric facility in Iraq that generates electricity using water from the Haditha Dam on the Euphrates River.
  • D. Dimona nuclear facility
    The Dimona nuclear facility is a highly secretive Israeli nuclear installation widely believed to be central to the country's undeclared nuclear weapons program.
  • E. Liapootah Power Station
    Liapootah Power Station is a hydroelectric power facility in Tasmania, Australia, that forms part of the state's extensive Derwent River power scheme.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasHydroelectricPlantSite
Context triple: [Naharayim/Baqura area, hasHydroelectricPlantSite, Naharayim power plant]
  • A. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • C. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • D. hasHydroelectricDevelopments chosen
    Indicates that one entity possesses, contains, or is associated with hydroelectric power generation installations or projects.
  • E. isInHydropowerCascade
    Indicates that one hydropower facility is part of a sequential chain of hydropower plants along the same water system, where its operation is hydrologically or operationally linked to others in the cascade.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90b7a188190b3fc7b8d4a6cd20a completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4df555af081908a2f12bce6a13f56 completed April 19, 2026, 1:57 p.m.
NED1 Entity disambiguation (via context triple) batch_6a038fc6c5008190a5ade67801d6df75 completed May 12, 2026, 8:38 p.m.
NEDg Description generation batch_6a03914c5f6081908963548dc01a524a completed May 12, 2026, 8:45 p.m.
NED2 Entity disambiguation (via description) batch_6a03925c322081909d435251e869194d completed May 12, 2026, 8:49 p.m.
PD Predicate disambiguation batch_69e4331baeb88190b21f50a98c36c78e completed April 19, 2026, 1:42 a.m.
Created at: April 10, 2026, 10:30 a.m.