Triple

T18156833
Position Surface form Disambiguated ID Type / Status
Subject Monaco-Monte-Carlo railway station E434652 entity
Predicate isOnInternationalCorridor P86239 FINISHED
Object France–Italy rail connection NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: France–Italy rail connection | Statement: [Monaco-Monte-Carlo railway station, isOnInternationalCorridor, France–Italy rail connection]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: France–Italy rail connection
Context triple: [Monaco-Monte-Carlo railway station, isOnInternationalCorridor, France–Italy rail connection]
  • A. Paris–Turin rail axis
    The Paris–Turin rail axis is a major trans-European railway corridor linking the French capital with northern Italy through the Alps, serving both passenger and freight traffic.
  • B. Lyon–Turin rail axis
    The Lyon–Turin rail axis is a major transalpine high-speed and freight railway project linking Lyon in France with Turin in Italy through long base tunnels under the Alps to improve cross-border transport.
  • C. Marseille–Ventimiglia railway chosen
    The Marseille–Ventimiglia railway is a major coastal rail line in southern France that connects Marseille to the Italian border, serving key cities along the French Riviera including Nice.
  • D. Genoa–Ventimiglia railway
    The Genoa–Ventimiglia railway is a major coastal rail line in northwestern Italy that runs along the Ligurian Sea, connecting Genoa with towns up to the French border.
  • E. Turin–Modane railway
    The Turin–Modane railway is a major trans-Alpine rail line connecting Turin in Italy with Modane in France, providing a key international route through the Alps.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isOnInternationalCorridor
Context triple: [Monaco-Monte-Carlo railway station, isOnInternationalCorridor, France–Italy rail connection]
  • A. connectsToInternationalCorridor
    Indicates that an entity has a direct linkage or access to an international transportation or trade corridor.
  • B. haveCrossBorderCorridor
    Indicates that there exists a designated corridor or route enabling movement or interaction across a national or regional border between the related entities.
  • C. locatedInTransportCorridor chosen
    Indicates that an entity is situated within a designated transport corridor used for the movement of people or goods.
  • D. isStrategicCorridor
    Indicates that a route, passage, or area serves as a critical pathway for movement, access, or control, giving it significant strategic importance.
  • E. hasCommercialCorridorAlong
    Indicates that a place contains a continuous stretch of commercial activity or businesses situated along a specified linear feature, such as a street or route.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90b7a188190b3fc7b8d4a6cd20a completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4debf43348190a22f23a4bbfab433 completed April 19, 2026, 1:55 p.m.
PD Predicate disambiguation batch_69e4331baeb88190b21f50a98c36c78e completed April 19, 2026, 1:42 a.m.
Created at: April 10, 2026, 10:30 a.m.