Triple
T1815129
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pont Alexandre III |
E40419
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Paris |
C6907
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Paris Context triple: [Pont Alexandre III, instanceOf, bridge in Paris]
-
A.
bridge in New York City
A bridge in New York City is a large-scale transportation structure spanning waterways or land to connect boroughs and neighborhoods, supporting vehicular, rail, bicycle, and pedestrian traffic within the city’s dense urban environment.
-
B.
former bridge
A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
-
C.
landmark in Paris
chosen
A landmark in Paris is a notable and often historic site, structure, or monument within the city that serves as a recognizable symbol of its cultural, architectural, or social identity.
-
D.
pedestrian bridge
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
E.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8864526c081908a3a4d74f689e2c5 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:32 p.m.