Triple

T18127262
Position Surface form Disambiguated ID Type / Status
Subject ITER E433908 entity
Predicate instanceOf P0 FINISHED
Object nuclear fusion research facility C4813 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear fusion research facility
Context triple: [ITER, instanceOf, nuclear fusion research facility]
  • A. fusion energy research facility chosen
    A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
  • B. isotope production facility
    An isotope production facility is a specialized installation that generates radioactive or stable isotopes—typically using reactors, cyclotrons, or accelerators—for use in medicine, industry, research, and energy applications.
  • C. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • D. nuclear weapons production facility
    A nuclear weapons production facility is a highly secured industrial complex where fissile materials are processed and assembled into components and complete systems for nuclear armaments.
  • E. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b909e8cc81908df4cc2b8ea6d11f completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:29 a.m.