Triple
T18127169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EAST |
E433906
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental fusion reactor |
C4813
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental fusion reactor Context triple: [EAST, instanceOf, experimental fusion reactor]
-
A.
fusion energy research facility
chosen
A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
-
B.
nuclear reactor project
A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
-
C.
nuclear reactor
A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
-
D.
tritium production reactor
A tritium production reactor is a specialized nuclear reactor designed and operated to generate tritium, typically by irradiating lithium-bearing materials with neutrons.
-
E.
plutonium production reactor
A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b909e8cc81908df4cc2b8ea6d11f |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:29 a.m.