Triple

T18119899
Position Surface form Disambiguated ID Type / Status
Subject Great Fast in Eastern Christianity E433703 entity
Predicate preparatoryPeriod P24075 FINISHED
Object Sundays before Lent LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sundays before Lent | Statement: [Great Fast in Eastern Christianity, preparatoryPeriod, Sundays before Lent]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: preparatoryPeriod
Context triple: [Great Fast in Eastern Christianity, preparatoryPeriod, Sundays before Lent]
  • A. preparationPeriod chosen
    Indicates the time span allocated before an event or action during which necessary preparations are made.
  • B. preparatoryRole
    Indicates that one entity performs a function or activity that serves as preparation or groundwork for another entity, event, or process.
  • C. preparedFor
    Indicates that one entity has been made ready, equipped, or arranged in anticipation of use by or in connection with another entity.
  • D. preparesFor
    Indicates that one entity is used, designed, or undertaken in order to get another entity ready for a future event, state, or activity.
  • E. trainingPeriod
    Indicates the duration or phase during which training or instruction is formally conducted.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b909e8cc81908df4cc2b8ea6d11f completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4ddd9b21c81908d23b8d9840410df completed April 19, 2026, 1:51 p.m.
PD Predicate disambiguation batch_69e43313ca788190baa224269e71de49 completed April 19, 2026, 1:42 a.m.
Created at: April 10, 2026, 10:28 a.m.