Triple

T18113813
Position Surface form Disambiguated ID Type / Status
Subject Hellefoss E433547 entity
Predicate partOf P40 FINISHED
Object Drammenselva hydropower system NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Drammenselva hydropower system | Statement: [Hellefoss, partOf, Drammenselva hydropower system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Drammenselva hydropower system
Context triple: [Hellefoss, partOf, Drammenselva hydropower system]
  • A. Hønefoss hydropower plant
    Hønefoss hydropower plant is a Norwegian hydroelectric facility located at Hønefoss, where it harnesses the flow of the Begna River to generate renewable electricity.
  • B. Døvikfoss power station
    Døvikfoss power station is a hydroelectric power plant located on the Drammenselva river in Norway, generating renewable electricity from the river’s waterfall.
  • C. Rødbergfoss kraftverk
    Rødbergfoss kraftverk is a Norwegian hydroelectric power station located at Rødberg, generating electricity from the Numedalslågen river system.
  • D. Sarpsfossen power station
    Sarpsfossen power station is a hydroelectric power plant in Norway that harnesses the energy of the Glomma River at the Sarpsfossen waterfall to generate electricity.
  • E. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Drammenselva hydropower system
Target entity description: The Drammenselva hydropower system is a network of hydroelectric power plants and related infrastructure along the Drammenselva River in Norway, used to generate renewable electricity from the river’s flow.
  • A. Hønefoss hydropower plant
    Hønefoss hydropower plant is a Norwegian hydroelectric facility located at Hønefoss, where it harnesses the flow of the Begna River to generate renewable electricity.
  • B. Døvikfoss power station chosen
    Døvikfoss power station is a hydroelectric power plant located on the Drammenselva river in Norway, generating renewable electricity from the river’s waterfall.
  • C. Rødbergfoss kraftverk
    Rødbergfoss kraftverk is a Norwegian hydroelectric power station located at Rødberg, generating electricity from the Numedalslågen river system.
  • D. Sarpsfossen power station
    Sarpsfossen power station is a hydroelectric power plant in Norway that harnesses the energy of the Glomma River at the Sarpsfossen waterfall to generate electricity.
  • E. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90916008190a1f110bd7ced5473 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4ddd3fd9c81909bfe95927f7553e3 completed April 19, 2026, 1:51 p.m.
Created at: April 10, 2026, 10:28 a.m.