Triple

T181138
Position Surface form Disambiguated ID Type / Status
Subject Eastham Lock E3878 entity
Predicate instanceOf P0 FINISHED
Object canal lock C3519 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: canal lock
Context triple: [Eastham Lock, instanceOf, canal lock]
  • A. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • B. lake
    A lake is a sizable, inland body of standing water, typically surrounded by land and fed by rivers, streams, precipitation, or groundwater.
  • C. isthmus
    An isthmus is a narrow strip of land bordered by water on both sides that connects two larger landmasses.
  • D. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • E. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25497e2f08190a040f8c6e1842643 completed Feb. 28, 2026, 2:36 a.m.
Created at: Feb. 28, 2026, 2:40 a.m.