Triple
T181138
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Eastham Lock |
E3878
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canal lock |
C3519
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canal lock Context triple: [Eastham Lock, instanceOf, canal lock]
-
A.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
B.
lake
A lake is a sizable, inland body of standing water, typically surrounded by land and fed by rivers, streams, precipitation, or groundwater.
-
C.
isthmus
An isthmus is a narrow strip of land bordered by water on both sides that connects two larger landmasses.
-
D.
pond
A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
-
E.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a25497e2f08190a040f8c6e1842643 |
completed | Feb. 28, 2026, 2:36 a.m. |
Created at: Feb. 28, 2026, 2:40 a.m.