Triple

T18080977
Position Surface form Disambiguated ID Type / Status
Subject Tennessee State Route 56 E432685 entity
Predicate abbreviation P43 FINISHED
Object SR 56
SR 56 is a state highway in Tennessee that runs north–south, connecting several towns and rural areas across the state.
E1307974 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 56 | Statement: [Tennessee State Route 56, abbreviation, SR 56]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 56
Context triple: [Tennessee State Route 56, abbreviation, SR 56]
  • A. SR 56
    SR 56 is a state highway in Indiana that runs east–west across the southern part of the state, connecting several towns and regional routes.
  • B. SR 56
    SR 56 is a primary state highway in Virginia that runs east–west through the central part of the state, connecting rural communities and scenic mountain areas.
  • C. SR 55
    SR 55 is a primary state highway in Tennessee that connects several communities in the south-central part of the state, serving as an important regional transportation route.
  • D. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • E. SR 51
    SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 56
Triple: [Tennessee State Route 56, abbreviation, SR 56]
Generated description
SR 56 is a state highway in Tennessee that runs north–south, connecting several towns and rural areas across the state.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 56
Target entity description: SR 56 is a state highway in Tennessee that runs north–south, connecting several towns and rural areas across the state.
  • A. SR 56
    SR 56 is a state highway in Indiana that runs east–west across the southern part of the state, connecting several towns and regional routes.
  • B. SR 56
    SR 56 is a primary state highway in Virginia that runs east–west through the central part of the state, connecting rural communities and scenic mountain areas.
  • C. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • D. SR 55
    SR 55 is a primary state highway in Tennessee that connects several communities in the south-central part of the state, serving as an important regional transportation route.
  • E. SR 51
    SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b907d05c819083cc3bd6021089e6 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4d9fa080081909e1a05e98185a026 completed April 19, 2026, 1:34 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0385376aac8190a508f09c1b8db219 completed May 12, 2026, 7:53 p.m.
NEDg Description generation batch_6a03881b21b88190bd65a20b7eab2879 completed May 12, 2026, 8:05 p.m.
NED2 Entity disambiguation (via description) batch_6a0388a09e908190a5abf97f627e7be0 completed May 12, 2026, 8:08 p.m.
Created at: April 10, 2026, 10:27 a.m.