Triple

T180584
Position Surface form Disambiguated ID Type / Status
Subject River Dee (part) E3865 entity
Predicate partOf P40 FINISHED
Object River Dee E3865 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Dee | Statement: [River Dee (part), partOf, River Dee]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Dee
Context triple: [River Dee (part), partOf, River Dee]
  • A. River Medlock
    The River Medlock is a small river in Greater Manchester, England, that flows through central Manchester and has played a significant role in the city’s industrial and urban development.
  • B. River Dee (part) chosen
    River Dee (part) is the section of the River Dee that flows through North West England, forming part of the region’s natural landscape and drainage system.
  • C. Walkill River
    The Walkill River is a north-flowing river in New Jersey and New York that drains part of the Appalachian Valley before joining the Hudson River.
  • D. Chelsea Creek
    Chelsea Creek is a tidal waterway in the Boston area that serves as an important industrial and shipping channel between Chelsea and East Boston, Massachusetts.
  • E. Eno River
    The Eno River is a scenic, historically significant waterway in North Carolina known for its protected natural habitats, recreational trails, and role in the development of the Durham area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25497e2f08190a040f8c6e1842643 completed Feb. 28, 2026, 2:36 a.m.
NER Named-entity recognition batch_69a25901a9188190b8f510bec8c8e7f2 completed Feb. 28, 2026, 2:54 a.m.
NED1 Entity disambiguation (via context triple) batch_69a30283df7081909701063a3ffa82aa completed Feb. 28, 2026, 2:58 p.m.
Created at: Feb. 28, 2026, 2:40 a.m.