Triple

T1805206
Position Surface form Disambiguated ID Type / Status
Subject Wazirabad Barrage E40204 entity
Predicate instanceOf P0 FINISHED
Object water-regulating structure C5154 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water-regulating structure
Context triple: [Wazirabad Barrage, instanceOf, water-regulating structure]
  • A. water management structure chosen
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • B. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • C. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • D. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • E. movable flood barrier
    A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88643a3388190a612f2ebe1fb29e7 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:32 p.m.