Triple

T18024657
Position Surface form Disambiguated ID Type / Status
Subject Ta Keo E431213 entity
Predicate stateOfConstruction P44772 FINISHED
Object unfinished LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: unfinished | Statement: [Ta Keo, stateOfConstruction, unfinished]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: stateOfConstruction
Context triple: [Ta Keo, stateOfConstruction, unfinished]
  • A. constructionPhase chosen
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • B. stateBuildingProcess
    Indicates the process by which governing institutions, administrative structures, and political authority are developed, organized, or strengthened within a state.
  • C. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • D. hasConstruction
    Indicates that one entity possesses, contains, or is characterized by a particular construction, structure, or built form associated with it.
  • E. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9050fb48190890155145deb0a66 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4b9c554348190bd0df06d0cfe188e completed April 19, 2026, 11:17 a.m.
PD Predicate disambiguation batch_69e3f904b8048190add43883cd7cb191 completed April 18, 2026, 9:35 p.m.
Created at: April 10, 2026, 10:24 a.m.