Triple

T17969540
Position Surface form Disambiguated ID Type / Status
Subject Fort Peck Dam E449298 entity
Predicate hasPowerPlant P9904 FINISHED
Object Fort Peck Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fort Peck Power Plant | Statement: [Fort Peck Dam, hasPowerPlant, Fort Peck Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fort Peck Power Plant
Context triple: [Fort Peck Dam, hasPowerPlant, Fort Peck Power Plant]
  • A. Beaver Dam Hydroelectric Plant
    Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
  • B. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • C. McArthur Falls Generating Station
    McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
  • D. Oker Dam hydroelectric power plant
    The Oker Dam hydroelectric power plant is a German hydropower facility that generates electricity using water impounded by the Oker Dam in the Harz region.
  • E. Fort Peck Dam
    Fort Peck Dam is a massive earthfill dam in northeastern Montana that creates Fort Peck Lake and plays a key role in flood control, hydroelectric power generation, and water management in the Missouri River system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fort Peck Power Plant
Target entity description: Fort Peck Power Plant is a hydroelectric generating facility in Montana that converts water released from Fort Peck Dam into electrical power for the surrounding region.
  • A. Beaver Dam Hydroelectric Plant
    Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
  • B. Leaburg Power Plant
    Leaburg Power Plant is a hydroelectric generating facility on the McKenzie River in Oregon, known for producing renewable electricity as part of the Leaburg Dam complex.
  • C. McArthur Falls Generating Station
    McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
  • D. Oker Dam hydroelectric power plant
    The Oker Dam hydroelectric power plant is a German hydropower facility that generates electricity using water impounded by the Oker Dam in the Harz region.
  • E. Fort Peck Dam
    Fort Peck Dam is a massive earthfill dam in northeastern Montana that creates Fort Peck Lake and plays a key role in flood control, hydroelectric power generation, and water management in the Missouri River system.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f9927c8190a006110c8b996e61 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4b13b1b088190b7d71006b31e5cc3 completed April 19, 2026, 10:40 a.m.
Created at: April 10, 2026, 10:22 a.m.