Triple

T17943166
Position Surface form Disambiguated ID Type / Status
Subject Armavia E448634 entity
Predicate operatedRoute P18593 FINISHED
Object Yerevan–Tbilisi NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yerevan–Tbilisi | Statement: [Armavia, operatedRoute, Yerevan–Tbilisi]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Yerevan–Tbilisi
Context triple: [Armavia, operatedRoute, Yerevan–Tbilisi]
  • A. Yerevan–Moscow
    Yerevan–Moscow is a major international air route linking the capital of Armenia with the capital of Russia.
  • B. Tbilisi–Yerevan railway line
    The Tbilisi–Yerevan railway line is an international rail route connecting the capitals of Georgia and Armenia, serving as a key passenger and freight corridor in the South Caucasus.
  • C. Yerevan–Tbilisi highway corridor chosen
    The Yerevan–Tbilisi highway corridor is a major international road route linking Armenia’s capital Yerevan with Georgia’s capital Tbilisi and serving as a key regional transport and trade artery.
  • D. Tbilisi–Baku line
    The Tbilisi–Baku line is an international railway route connecting the capitals of Georgia and Azerbaijan, serving as a key transport corridor in the South Caucasus region.
  • E. Tbilisi–Gori transport corridor
    The Tbilisi–Gori transport corridor is a major transit route in eastern Georgia that connects the capital Tbilisi with the city of Gori and passes through several intermediate towns and industrial areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f79d14819095540856928f0e25 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4ad97611c8190a861467ae51f6c48 completed April 19, 2026, 10:25 a.m.
Created at: April 10, 2026, 10:21 a.m.