Triple
T17927397
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tionesta Creek |
E448232
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Tionesta Dam |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tionesta Dam | Statement: [Tionesta Creek, hasDam, Tionesta Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tionesta Dam Context triple: [Tionesta Creek, hasDam, Tionesta Dam]
-
A.
Tieton Dam
Tieton Dam is a concrete multiple-arch dam in central Washington State that provides irrigation water storage, flood control, and hydroelectric power as part of the U.S. Bureau of Reclamation’s Yakima River basin developments.
-
B.
Hinze Dam
Hinze Dam is a major rock and earth-fill dam on the Gold Coast in Queensland, Australia, that creates Advancetown Lake and supplies water, flood mitigation, and recreation for the region.
-
C.
Rossens Dam
Rossens Dam is a large concrete arch-gravity dam on the Sarine River in the canton of Fribourg, Switzerland, primarily used for hydroelectric power generation and creating the Lake of Gruyère reservoir.
-
D.
Kremasta Dam
Kremasta Dam is a major hydroelectric and water management dam in western Greece, forming one of the country’s largest artificial lakes.
-
E.
Nosice Dam
Nosice Dam is a hydroelectric dam on the Váh River in Slovakia, used for power generation, flood control, and water management.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Tionesta Dam Target entity description: Tionesta Dam is a flood-control and recreation dam on Tionesta Creek in northwestern Pennsylvania, forming Tionesta Lake and helping manage water levels in the Allegheny River basin.
-
A.
Tieton Dam
Tieton Dam is a concrete multiple-arch dam in central Washington State that provides irrigation water storage, flood control, and hydroelectric power as part of the U.S. Bureau of Reclamation’s Yakima River basin developments.
-
B.
Hinze Dam
Hinze Dam is a major rock and earth-fill dam on the Gold Coast in Queensland, Australia, that creates Advancetown Lake and supplies water, flood mitigation, and recreation for the region.
-
C.
Rossens Dam
Rossens Dam is a large concrete arch-gravity dam on the Sarine River in the canton of Fribourg, Switzerland, primarily used for hydroelectric power generation and creating the Lake of Gruyère reservoir.
-
D.
Kremasta Dam
Kremasta Dam is a major hydroelectric and water management dam in western Greece, forming one of the country’s largest artificial lakes.
-
E.
Nosice Dam
Nosice Dam is a hydroelectric dam on the Váh River in Slovakia, used for power generation, flood control, and water management.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f79d14819095540856928f0e25 |
completed | April 10, 2026, 8:51 a.m. |
| NER | Named-entity recognition | batch_69e4a54f29a88190b035d8473765bde5 |
completed | April 19, 2026, 9:50 a.m. |
Created at: April 10, 2026, 10:20 a.m.