Triple
T17894450
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Avangard hypersonic glide vehicle |
E447397
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hypersonic glide vehicle |
C35401
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hypersonic glide vehicle Context triple: [Avangard hypersonic glide vehicle, instanceOf, hypersonic glide vehicle]
-
A.
reusable spaceplane
A reusable spaceplane is a winged spacecraft designed to take off, operate, and land multiple times like an aircraft while transporting payloads or crew between Earth and space.
-
B.
rocket-powered aircraft
A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
-
C.
supersonic aircraft
A supersonic aircraft is a high-speed airplane designed to travel faster than the speed of sound, typically using specialized aerodynamics and powerful jet engines to minimize drag and withstand intense aerodynamic forces.
-
D.
ablative thermal protection system
An ablative thermal protection system is a heat shield that protects a spacecraft by sacrificially charring, melting, and eroding material to absorb and carry away extreme reentry heat.
-
E.
rocket-boosted missile
chosen
A rocket-boosted missile is a guided or unguided projectile that uses rocket propulsion to rapidly accelerate and deliver a warhead or payload to a distant target.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f59bd48190a6fc925a855b8bac |
completed | April 10, 2026, 8:51 a.m. |
Created at: April 10, 2026, 10:19 a.m.