Triple

T17870597
Position Surface form Disambiguated ID Type / Status
Subject NEM New South Wales region E446824 entity
Predicate interconnector P24733 FINISHED
Object Terranora interconnector
The Terranora interconnector is a high-voltage transmission link that connects the New South Wales section of Australia’s National Electricity Market with the Queensland power system to facilitate cross-border electricity flows.
E1292601 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terranora interconnector | Statement: [NEM New South Wales region, interconnector, Terranora interconnector]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Terranora interconnector
Context triple: [NEM New South Wales region, interconnector, Terranora interconnector]
  • A. UK–continental Europe interconnector
    The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
  • B. Montalto di Castro power station
    Montalto di Castro power station is a large thermal power plant in Italy, originally planned as a nuclear facility and later converted to conventional generation.
  • C. Vizzavona tunnel
    The Vizzavona tunnel is a major railway tunnel in Corsica that carries the island’s central rail line beneath the mountainous Vizzavona Pass.
  • D. TurkStream
    TurkStream is a major natural gas pipeline system running from Russia to Turkey across the Black Sea, designed to supply gas to Turkey and Southern Europe.
  • E. Rossio–Campolide tunnel
    The Rossio–Campolide tunnel is a key railway tunnel in Lisbon, Portugal, carrying suburban and regional trains between the city center and the inland rail network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Terranora interconnector
Triple: [NEM New South Wales region, interconnector, Terranora interconnector]
Generated description
The Terranora interconnector is a high-voltage transmission link that connects the New South Wales section of Australia’s National Electricity Market with the Queensland power system to facilitate cross-border electricity flows.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Terranora interconnector
Target entity description: The Terranora interconnector is a high-voltage transmission link that connects the New South Wales section of Australia’s National Electricity Market with the Queensland power system to facilitate cross-border electricity flows.
  • A. UK–continental Europe interconnector
    The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
  • B. Montalto di Castro power station
    Montalto di Castro power station is a large thermal power plant in Italy, originally planned as a nuclear facility and later converted to conventional generation.
  • C. Vizzavona tunnel
    The Vizzavona tunnel is a major railway tunnel in Corsica that carries the island’s central rail line beneath the mountainous Vizzavona Pass.
  • D. TurkStream
    TurkStream is a major natural gas pipeline system running from Russia to Turkey across the Black Sea, designed to supply gas to Turkey and Southern Europe.
  • E. Rossio–Campolide tunnel
    The Rossio–Campolide tunnel is a key railway tunnel in Lisbon, Portugal, carrying suburban and regional trains between the city center and the inland rail network.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f4c22c819093c2680434472894 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e49aa24c8481909de38953a88ff615 completed April 19, 2026, 9:04 a.m.
NED1 Entity disambiguation (via context triple) batch_6a030c6bfdb08190bb3eeeb9b8b09ad2 completed May 12, 2026, 11:18 a.m.
NEDg Description generation batch_6a030d85e91481908e6afd4a83d78ce8 completed May 12, 2026, 11:22 a.m.
NED2 Entity disambiguation (via description) batch_6a030e6412dc81908b392bdf47934230 completed May 12, 2026, 11:26 a.m.
Created at: April 10, 2026, 10:18 a.m.