Triple

T17867165
Position Surface form Disambiguated ID Type / Status
Subject Pitlochry Dam E446732 entity
Predicate partOf P40 FINISHED
Object North of Scotland Hydro-Electric Board schemes NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North of Scotland Hydro-Electric Board schemes | Statement: [Pitlochry Dam, partOf, North of Scotland Hydro-Electric Board schemes]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North of Scotland Hydro-Electric Board schemes
Context triple: [Pitlochry Dam, partOf, North of Scotland Hydro-Electric Board schemes]
  • A. Tummel hydroelectric scheme chosen
    The Tummel hydroelectric scheme is a major Scottish power project comprising a series of dams, reservoirs, and power stations that harness the waters of the River Tummel and its tributaries to generate electricity.
  • B. Gordon–Pedder hydroelectric scheme
    The Gordon–Pedder hydroelectric scheme is a major Tasmanian power project that harnesses water from Lake Pedder and surrounding catchments to generate hydroelectricity for the region.
  • C. Derwent hydropower scheme
    The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
  • D. Scottish Hydro-Electric
    Scottish Hydro-Electric was a major Scottish electricity generation and distribution company that became one of the core predecessors of today’s SSE plc.
  • E. Shannon hydroelectric scheme
    The Shannon hydroelectric scheme is a major early 20th-century Irish engineering project that harnesses the River Shannon to generate electricity and played a key role in the country’s industrial development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f4c22c819093c2680434472894 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e49a9f95688190aeace742e8e7c4c0 completed April 19, 2026, 9:04 a.m.
Created at: April 10, 2026, 10:17 a.m.