Triple

T17860817
Position Surface form Disambiguated ID Type / Status
Subject Oberaarsee E446065 entity
Predicate connectedTo P37 FINISHED
Object Grimselsee (via hydropower system) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Grimselsee (via hydropower system) | Statement: [Oberaarsee, connectedTo, Grimselsee (via hydropower system)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Grimselsee (via hydropower system)
Context triple: [Oberaarsee, connectedTo, Grimselsee (via hydropower system)]
  • A. Schluchsee hydropower plant
    The Schluchsee hydropower plant is a major pumped-storage hydroelectric facility in Germany’s Black Forest region, providing flexible electricity generation and grid balancing services.
  • B. Säckingen hydropower plant
    The Säckingen hydropower plant is a hydroelectric facility on the Upper Rhine in Germany that generates renewable electricity as part of the Schluchseewerk AG power plant network.
  • C. Kembs hydroelectric power station
    Kembs hydroelectric power station is a run-of-the-river hydroelectric facility on the Rhine in France, known as one of the oldest major plants harnessing the Grand Canal d’Alsace for power generation.
  • D. Okertalsperre power station
    Okertalsperre power station is a hydroelectric facility in Germany that generates electricity using water from the Okertalsperre reservoir in the Harz Mountains.
  • E. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Grimselsee (via hydropower system)
Target entity description: Grimselsee (via hydropower system) is a reservoir in the Swiss Alps that forms part of a major hydroelectric complex, receiving water from Oberaarsee and supporting regional power generation.
  • A. Schluchsee hydropower plant
    The Schluchsee hydropower plant is a major pumped-storage hydroelectric facility in Germany’s Black Forest region, providing flexible electricity generation and grid balancing services.
  • B. Säckingen hydropower plant
    The Säckingen hydropower plant is a hydroelectric facility on the Upper Rhine in Germany that generates renewable electricity as part of the Schluchseewerk AG power plant network.
  • C. Kembs hydroelectric power station
    Kembs hydroelectric power station is a run-of-the-river hydroelectric facility on the Rhine in France, known as one of the oldest major plants harnessing the Grand Canal d’Alsace for power generation.
  • D. Okertalsperre power station
    Okertalsperre power station is a hydroelectric facility in Germany that generates electricity using water from the Okertalsperre reservoir in the Harz Mountains.
  • E. Lysebotn Hydropower Station
    Lysebotn Hydropower Station is a major Norwegian hydroelectric power plant located at the end of the Lysefjord, known for its large underground facilities and significant electricity production.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f26f18819089c9e43250bee6ae completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4979013dc8190beb7718f0ba92bc3 completed April 19, 2026, 8:51 a.m.
Created at: April 10, 2026, 10:17 a.m.