Triple

T1785242
Position Surface form Disambiguated ID Type / Status
Subject Carrier Global E39376 entity
Predicate instanceOf P0 FINISHED
Object HVAC company C8469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: HVAC company
Context triple: [Carrier Global, instanceOf, HVAC company]
  • A. maintenance agency
    A maintenance agency is an organization that provides ongoing repair, upkeep, and facility management services for buildings, equipment, or infrastructure on behalf of clients.
  • B. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • C. automotive services company
    An automotive services company is a business that provides maintenance, repair, inspection, and related support services for vehicles to ensure their safety, reliability, and performance.
  • D. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • E. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88630519c8190a17addd83c4a3ef4 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:31 p.m.