Triple

T1784539
Position Surface form Disambiguated ID Type / Status
Subject Man'yōshū E39360 entity
Predicate finalEditingCompleted P1574 FINISHED
Object circa 759 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: circa 759 | Statement: [Man'yōshū, finalEditingCompleted, circa 759]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalEditingCompleted
Context triple: [Man'yōshū, finalEditingCompleted, circa 759]
  • A. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • B. finalOperations
    Indicates that an entity is involved in the last or concluding set of actions or processes within a sequence or workflow.
  • C. completedIn chosen
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • D. finalDisposition
    Indicates the ultimate outcome, status, or resolution assigned to an entity after all relevant processes or decisions are complete.
  • E. productionEnd
    Indicates that a production process, activity, or run has come to its completion or final stopping point.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88630519c8190a17addd83c4a3ef4 completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69ab75457e54819096b8c6ae8c65550c completed March 7, 2026, 12:45 a.m.
PD Predicate disambiguation batch_69aa61d165688190924962a98e07ff69 completed March 6, 2026, 5:10 a.m.
Created at: March 4, 2026, 7:31 p.m.