Triple

T17836068
Position Surface form Disambiguated ID Type / Status
Subject Mahi River E445386 entity
Predicate hasDam P8736 FINISHED
Object Kadana Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kadana Dam | Statement: [Mahi River, hasDam, Kadana Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kadana Dam
Context triple: [Mahi River, hasDam, Kadana Dam]
  • A. Koka Dam
    Koka Dam is a major hydroelectric and irrigation dam in Ethiopia that creates the Koka Reservoir on the Awash River.
  • B. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • C. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • D. Bokaa Dam
    Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
  • E. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kadana Dam
Target entity description: Kadana Dam is a major multi-purpose dam in Gujarat, India, built on the Mahi River for irrigation, hydroelectric power generation, and flood control.
  • A. Koka Dam
    Koka Dam is a major hydroelectric and irrigation dam in Ethiopia that creates the Koka Reservoir on the Awash River.
  • B. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • C. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • D. Bokaa Dam
    Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
  • E. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f1a6d881909f024bc603111cdb completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48d27f8908190bf48a8153756effa completed April 19, 2026, 8:07 a.m.
Created at: April 10, 2026, 10:16 a.m.