Triple

T17836068
Position Surface form Disambiguated ID Type / Status
Subject Mahi River E445386 entity
Predicate hasDam P8736 FINISHED
Object Kadana Dam
Kadana Dam is a major multi-purpose dam in Gujarat, India, built on the Mahi River for irrigation, hydroelectric power generation, and flood control.
E1291372 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kadana Dam | Statement: [Mahi River, hasDam, Kadana Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kadana Dam
Context triple: [Mahi River, hasDam, Kadana Dam]
  • A. Koka Dam
    Koka Dam is a major hydroelectric and irrigation dam in Ethiopia that creates the Koka Reservoir on the Awash River.
  • B. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • C. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • D. Bokaa Dam
    Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
  • E. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kadana Dam
Triple: [Mahi River, hasDam, Kadana Dam]
Generated description
Kadana Dam is a major multi-purpose dam in Gujarat, India, built on the Mahi River for irrigation, hydroelectric power generation, and flood control.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kadana Dam
Target entity description: Kadana Dam is a major multi-purpose dam in Gujarat, India, built on the Mahi River for irrigation, hydroelectric power generation, and flood control.
  • A. Koka Dam
    Koka Dam is a major hydroelectric and irrigation dam in Ethiopia that creates the Koka Reservoir on the Awash River.
  • B. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • C. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • D. Bokaa Dam
    Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
  • E. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f1a6d881909f024bc603111cdb completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48d27f8908190bf48a8153756effa completed April 19, 2026, 8:07 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0306fa32e481908ef71c18b6f37d59 completed May 12, 2026, 10:54 a.m.
NEDg Description generation batch_6a030804acf081908b4f00aa4e45e842 completed May 12, 2026, 10:59 a.m.
NED2 Entity disambiguation (via description) batch_6a0308a29f1081909a44c221aefb723c completed May 12, 2026, 11:01 a.m.
Created at: April 10, 2026, 10:16 a.m.