Triple

T1783586
Position Surface form Disambiguated ID Type / Status
Subject Dragonfly E39340 entity
Predicate instanceOf P0 FINISHED
Object rotorcraft lander C8462 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rotorcraft lander
Context triple: [Dragonfly, instanceOf, rotorcraft lander]
  • A. short takeoff and vertical landing aircraft
    A short takeoff and vertical landing aircraft is a type of airplane designed to operate from very short runways and perform vertical or near-vertical takeoffs and landings using specialized lift and thrust systems.
  • B. heavy-lift helicopter
    A heavy-lift helicopter is a large rotary-wing aircraft designed to transport exceptionally heavy cargo, equipment, or personnel, often in challenging environments and over relatively short distances.
  • C. military helicopter
    A military helicopter is a rotary-wing aircraft designed and equipped for combat, transport, reconnaissance, and support missions in military operations.
  • D. rocket-powered aircraft
    A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
  • E. utility helicopter
    A utility helicopter is a versatile rotary-wing aircraft designed to perform a wide range of support roles such as transport, reconnaissance, search and rescue, and logistical missions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88630519c8190a17addd83c4a3ef4 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:31 p.m.