Triple

T17823786
Position Surface form Disambiguated ID Type / Status
Subject Magat River E445058 entity
Predicate hasDam P8736 FINISHED
Object Magat Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Magat Dam | Statement: [Magat River, hasDam, Magat Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Magat Dam
Context triple: [Magat River, hasDam, Magat Dam]
  • A. Magat Dam chosen
    Magat Dam is a large multipurpose rock-fill dam in the Philippines that provides hydroelectric power, irrigation, and flood control for the Cagayan Valley region.
  • B. Ambuklao Dam
    Ambuklao Dam is a major hydroelectric and flood-control dam in Benguet, Philippines, known as one of the country’s earliest large-scale hydropower projects.
  • C. Malpaso Dam
    Malpaso Dam is a major hydroelectric dam in Chiapas, Mexico, forming one of the country’s largest reservoirs and playing a key role in national power generation and flood control.
  • D. Saguling Dam
    Saguling Dam is a major hydroelectric and multipurpose dam in West Java, Indonesia, forming one of the key reservoirs on the Citarum River.
  • E. Nangbeto Dam
    Nangbeto Dam is a hydroelectric and irrigation dam on the Mono River in West Africa, jointly developed by Togo and Benin to generate power and support regional water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4891282a081908d384d45bf444baf completed April 19, 2026, 7:49 a.m.
Created at: April 10, 2026, 10:15 a.m.