Triple

T17820139
Position Surface form Disambiguated ID Type / Status
Subject Wiesbachhorn E444959 entity
Predicate normalRouteFrom P32243 FINISHED
Object Mooserboden dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mooserboden dam | Statement: [Wiesbachhorn, normalRouteFrom, Mooserboden dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mooserboden dam
Context triple: [Wiesbachhorn, normalRouteFrom, Mooserboden dam]
  • A. Mooserboden reservoir chosen
    Mooserboden reservoir is a high-altitude hydroelectric storage lake in the Austrian Alps, known for its impressive dam structures and surrounding glacier scenery.
  • B. Ballindamm
    Ballindamm is a prominent boulevard in central Hamburg, Germany, known for its upscale shops, offices, and views over the Binnenalster lake.
  • C. Hohenwarte Dam
    Hohenwarte Dam is a large hydroelectric and flood-control dam on the Saale River in Thuringia, Germany, forming one of the country’s significant reservoir lakes.
  • D. Baldeneysee dam
    The Baldeneysee dam is a water-retaining structure on the Ruhr River in Essen, Germany, that forms and regulates the Baldeneysee reservoir used for recreation, water management, and energy purposes.
  • E. Hengstey dam
    Hengstey dam is a hydroelectric and flood-control dam on the Ruhr River in North Rhine-Westphalia, Germany, forming the Hengsteysee reservoir near the cities of Hagen and Dortmund.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e489101aa48190a1439d8cb683bba9 completed April 19, 2026, 7:49 a.m.
Created at: April 10, 2026, 10:15 a.m.