Triple

T17815580
Position Surface form Disambiguated ID Type / Status
Subject William Wright Dock E444829 entity
Predicate instanceOf P0 FINISHED
Object commercial dock C37209 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commercial dock
Context triple: [William Wright Dock, instanceOf, commercial dock]
  • A. docking facility chosen
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • B. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • C. public dock
    A public dock is a shared waterfront structure that provides open access for boats and pedestrians to moor, load, unload, and enjoy the surrounding waterway.
  • D. ore dock
    An ore dock is a specialized waterfront structure used for the storage, handling, and loading of bulk ore from rail or conveyor systems onto ships for transport.
  • E. wet dock
    A wet dock is an enclosed, water-filled harbor basin where ships can be moored, loaded, and unloaded while maintaining a constant water level independent of tides.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:14 a.m.