Triple

T17809744
Position Surface form Disambiguated ID Type / Status
Subject Hardy Toll Road E444665 entity
Predicate connectsTo P845 FINISHED
Object Beltway 8 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beltway 8 | Statement: [Hardy Toll Road, connectsTo, Beltway 8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Beltway 8
Context triple: [Hardy Toll Road, connectsTo, Beltway 8]
  • A. Beltway 8 chosen
    Beltway 8, also known as the Sam Houston Tollway, is a major loop highway encircling much of the Houston metropolitan area and serving as a key route for regional traffic.
  • B. Bow Down to Washington
    "Bow Down to Washington" is the traditional fight song of the University of Washington, widely recognized and played at the school's athletic events, especially football games.
  • C. the Beltway
    The Beltway is the major circumferential highway encircling Washington, D.C., serving as a key commuter and transit route for the metropolitan area.
  • D. B-Town
    B-Town is a common nickname for Bloomington, Indiana, a vibrant Midwestern college city best known as the home of Indiana University.
  • E. Seven Corners
    Seven Corners is a densely developed commercial and residential area in Fairfax County, Northern Virginia, known for its major road junction and large shopping centers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4887a50488190b9c148146ec607e6 completed April 19, 2026, 7:47 a.m.
Created at: April 10, 2026, 10:14 a.m.