Triple

T17804469
Position Surface form Disambiguated ID Type / Status
Subject Wyrley and Essington Canal E444518 entity
Predicate connectsTo P845 FINISHED
Object Daw End Branch NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Daw End Branch | Statement: [Wyrley and Essington Canal, connectsTo, Daw End Branch]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Daw End Branch
Context triple: [Wyrley and Essington Canal, connectsTo, Daw End Branch]
  • A. Daw End Branch chosen
    Daw End Branch is a canal in the West Midlands, England, forming part of the Birmingham Canal Navigations network and serving former industrial areas around Walsall.
  • B. Ruabon Brook branch
    The Ruabon Brook branch was a former industrial railway line in North Wales that primarily served local collieries and ironworks.
  • C. Losterdale Brook
    Losterdale Brook is a small stream in Lancashire, England, that forms part of the River Hodder’s upland tributary network in the Forest of Bowland.
  • D. Bennett Brook
    Bennett Brook is a minor watercourse in Western Australia that feeds into the Swan River and flows through parts of Perth’s northeastern suburbs.
  • E. Langden Brook
    Langden Brook is a small watercourse in Lancashire, England, that flows through the Forest of Bowland before joining the River Hodder.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9efe370819095cd219b143ae727 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48802bcfc8190a138164d11081ab8 completed April 19, 2026, 7:45 a.m.
Created at: April 10, 2026, 10:14 a.m.