Triple

T17796477
Position Surface form Disambiguated ID Type / Status
Subject TriMet transit centers E444305 entity
Predicate instanceOf P0 FINISHED
Object transit center system C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transit center system
Context triple: [TriMet transit centers, instanceOf, transit center system]
  • A. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • B. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • C. public transit station
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • D. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • E. public transit fare payment system
    A public transit fare payment system manages the calculation, collection, validation, and tracking of passenger payments across various transit services and media (e.g., cards, mobile apps, tickets) to authorize and record travel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9efe370819095cd219b143ae727 completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:13 a.m.