Triple

T17787481
Position Surface form Disambiguated ID Type / Status
Subject Fanno Creek E444055 entity
Predicate knownFor P22 FINISHED
Object Fanno Creek Greenway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fanno Creek Greenway | Statement: [Fanno Creek, knownFor, Fanno Creek Greenway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fanno Creek Greenway
Context triple: [Fanno Creek, knownFor, Fanno Creek Greenway]
  • A. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • B. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • C. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • D. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • E. Clear Creek Greenway
    Clear Creek Greenway is a protected natural and recreational corridor in Shasta County, California, featuring trails, riparian habitat, and public access along Clear Creek.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fanno Creek Greenway
Target entity description: Fanno Creek Greenway is a popular multi-use trail and natural corridor in the Portland, Oregon metropolitan area, offering recreational paths, wildlife habitat, and green space along Fanno Creek.
  • A. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • B. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • C. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • D. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • E. Clear Creek Greenway
    Clear Creek Greenway is a protected natural and recreational corridor in Shasta County, California, featuring trails, riparian habitat, and public access along Clear Creek.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ef17708190bdf7e2adbf14ddc2 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48794542c8190b049bce6e28c9f3a completed April 19, 2026, 7:43 a.m.
Created at: April 10, 2026, 10:12 a.m.