Triple

T17763410
Position Surface form Disambiguated ID Type / Status
Subject Illinois Route 7 E443439 entity
Predicate hasJunctionWith P1018 FINISHED
Object Illinois Route 53 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Illinois Route 53 | Statement: [Illinois Route 7, hasJunctionWith, Illinois Route 53]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Illinois Route 53
Context triple: [Illinois Route 7, hasJunctionWith, Illinois Route 53]
  • A. Illinois Route 53 chosen
    Illinois Route 53 is a north–south state highway in northeastern Illinois that serves suburban communities as a major arterial and, in parts, freeway corridor.
  • B. Illinois Route 57
    Illinois Route 57 is a north–south state highway in western Illinois that connects Quincy to Interstate 72 and other regional routes.
  • C. Illinois Route 56
    Illinois Route 56 is a state highway in northeastern Illinois that connects the western suburbs of Chicago, including areas like Downers Grove, to communities farther west.
  • D. Illinois Route 58
    Illinois Route 58 is a state highway in northeastern Illinois that runs through Chicago’s northwest suburbs, serving as a key east–west arterial route.
  • E. Illinois Route 54
    Illinois Route 54 is a state highway in central Illinois that runs generally northeast–southwest, connecting rural communities and serving as a regional connector between local roads and major routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9edf16c8190a59ebd245d378f4f completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e485f9fa188190aef5ffeb0b628632 completed April 19, 2026, 7:36 a.m.
Created at: April 10, 2026, 10:11 a.m.