Triple
T17751122
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | West Bengal Board of Secondary Education |
E443115
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | exam board |
C16704
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: exam board Context triple: [West Bengal Board of Secondary Education, instanceOf, exam board]
-
A.
examination board
chosen
An examination board is a formal group of qualified individuals responsible for designing, administering, and evaluating assessments to ensure fair and consistent measurement of candidates’ knowledge or skills.
-
B.
examination system
An examination system is a structured framework of processes and tools used to create, administer, monitor, and evaluate tests or assessments for measuring learners’ knowledge, skills, or performance.
-
C.
board committee
A board committee is a small, specialized group of board members delegated specific responsibilities to support the board’s governance, oversight, and decision-making functions.
-
D.
standardized exam
A standardized exam is a formal test administered and scored in a consistent, uniform manner to measure individuals’ knowledge, skills, or aptitude against common criteria.
-
E.
music examination board
A music examination board is an organization that designs, administers, and certifies graded assessments of musical performance, theory, and related skills.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9ed3a2081909b2ec0d4dd2f4c37 |
completed | April 10, 2026, 8:50 a.m. |
Created at: April 10, 2026, 10:10 a.m.