Triple

T17733852
Position Surface form Disambiguated ID Type / Status
Subject Clear Creek (Sacramento River tributary) E442658 entity
Predicate flowsThrough P225 FINISHED
Object Clear Creek Greenway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Clear Creek Greenway | Statement: [Clear Creek (Sacramento River tributary), flowsThrough, Clear Creek Greenway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Clear Creek Greenway
Context triple: [Clear Creek (Sacramento River tributary), flowsThrough, Clear Creek Greenway]
  • A. Fall Creek Greenway
    Fall Creek Greenway is a recreational trail and park corridor that follows Fall Creek, offering paths for walking, running, and cycling through natural and urban landscapes.
  • B. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • C. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • D. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • E. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Clear Creek Greenway
Target entity description: Clear Creek Greenway is a protected natural and recreational corridor in Shasta County, California, featuring trails, riparian habitat, and public access along Clear Creek.
  • A. Fall Creek Greenway
    Fall Creek Greenway is a recreational trail and park corridor that follows Fall Creek, offering paths for walking, running, and cycling through natural and urban landscapes.
  • B. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • C. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • D. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • E. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ed3a2081909b2ec0d4dd2f4c37 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e478e86f188190a5dd7fb32fd04c7b completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 10:08 a.m.