Triple

T17727490
Position Surface form Disambiguated ID Type / Status
Subject Eastern Gap E442500 entity
Predicate parallelTo P1868 FINISHED
Object Western Gap NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Western Gap | Statement: [Eastern Gap, parallelTo, Western Gap]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Western Gap
Context triple: [Eastern Gap, parallelTo, Western Gap]
  • A. Western Gap chosen
    Western Gap is a navigational channel at the western entrance of Toronto Harbour that provides access between Lake Ontario and the inner harbour near downtown Toronto.
  • B. Eastern Gap
    Eastern Gap is a navigational channel at the eastern entrance of Toronto Harbour that separates the Toronto Islands from the mainland and provides access for ships to the inner harbour.
  • C. Indian Gap
    Indian Gap is a mountain pass in the Great Smoky Mountains that historically served as a key crossing point along the Tennessee–North Carolina border.
  • D. Ringgold Gap
    Ringgold Gap is a strategically important mountain pass in northwestern Georgia, historically noted as the site of a significant Civil War battle.
  • E. Iron Mountain Gap
    Iron Mountain Gap is a mountain pass in the Appalachian Mountains that provides a key crossing point between Tennessee and North Carolina.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ec79688190b86bdcef85a7b3aa completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e478e3cb708190b47456ad2008a65e completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 10:07 a.m.