Triple

T17725812
Position Surface form Disambiguated ID Type / Status
Subject Chicago Transit Authority Green Line stations E442458 entity
Predicate instanceOf P0 FINISHED
Object Chicago 'L' stations C34631 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chicago 'L' stations
Context triple: [Chicago Transit Authority Green Line stations, instanceOf, Chicago 'L' stations]
  • A. Chicago 'L' station stop chosen
    A Chicago 'L' station stop is a designated passenger boarding and alighting point along the Chicago Transit Authority’s elevated and subway rail network, typically featuring platforms, signage, fare controls, and connections to other transit services.
  • B. Chicago 'L' service
    Chicago 'L' service is the rapid transit system of Chicago, consisting of elevated, subway, and at-grade rail lines that provide frequent urban and suburban passenger transportation across the metropolitan area.
  • C. former Chicago 'L' station
    A former Chicago 'L' station is a decommissioned elevated rapid transit stop in Chicago that once served passengers on the city's 'L' system but has since been closed, removed, or repurposed.
  • D. South Shore Line station
    A South Shore Line station is a designated stop along the South Shore Line commuter rail system where passengers can board, alight, and transfer between trains and other modes of transportation.
  • E. Purple Line station
    A Purple Line station is a designated stop or terminal along a transit system's Purple Line where passengers can board, alight, and transfer between services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ec79688190b86bdcef85a7b3aa completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:07 a.m.