Triple

T17718014
Position Surface form Disambiguated ID Type / Status
Subject FCC Form 486 E442256 entity
Predicate instanceOf P0 FINISHED
Object E-Rate program document C39589 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: E-Rate program document
Context triple: [FCC Form 486, instanceOf, E-Rate program document]
  • A. family of digital subscriber line technologies
    A family of digital subscriber line technologies is a group of related high-speed data transmission methods that use existing telephone lines to deliver broadband internet and other digital services.
  • B. division of the National Telecommunications and Information Administration
    A division of the National Telecommunications and Information Administration is an organizational unit within the NTIA responsible for carrying out specific telecommunications and information policy, research, or programmatic functions in support of the agency’s mission.
  • C. Amtrak program
    An Amtrak program is an organized set of services, policies, and initiatives designed to manage and enhance passenger rail operations, customer experience, and related business objectives within the Amtrak system.
  • D. IEEE 802.21 feature set
    The IEEE 802.21 feature set comprises mechanisms and protocols that enable seamless media-independent handover and service continuity across heterogeneous wireless and wired networks.
  • E. Ethernet fronthaul standard
    An Ethernet fronthaul standard defines the protocols, interfaces, and performance requirements for transporting radio access network (RAN) traffic between distributed radio units and centralized baseband units over Ethernet-based networks.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ec79688190b86bdcef85a7b3aa completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:06 a.m.