Triple

T17683645
Position Surface form Disambiguated ID Type / Status
Subject Podrinje region E440831 entity
Predicate hydropowerPlant P15311 FINISHED
Object Bajina Bašta Hydroelectric Power Plant NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bajina Bašta Hydroelectric Power Plant | Statement: [Podrinje region, hydropowerPlant, Bajina Bašta Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bajina Bašta Hydroelectric Power Plant
Context triple: [Podrinje region, hydropowerPlant, Bajina Bašta Hydroelectric Power Plant]
  • A. Iron Gate II Hydroelectric Power Station
    Iron Gate II Hydroelectric Power Station is a large hydroelectric dam complex on the Danube River jointly operated by Romania and Serbia, serving as a major source of renewable energy and river regulation in the region.
  • B. Bajina Bašta Dam chosen
    Bajina Bašta Dam is a major hydroelectric dam on the Drina River in western Serbia, known for its significant role in regional power generation and water management.
  • C. Iron Gate I Hydroelectric Power Station
    Iron Gate I Hydroelectric Power Station is a major hydroelectric dam and power plant on the Danube River, jointly operated by Romania and Serbia and known as one of the largest such facilities in Europe.
  • D. Orava Hydroelectric Power Plant
    Orava Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Orava Reservoir in northern Slovakia.
  • E. Jablanica Dam
    Jablanica Dam is a large hydroelectric dam on the Neretva River in Bosnia and Herzegovina, forming Jablanica Lake and serving as a key source of regional power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9e940b081908b862bb0e6e89b0d completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4704626308190bbdd98d27beb3f24 completed April 19, 2026, 6:03 a.m.
Created at: April 10, 2026, 10:02 a.m.