Triple
T17683614
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Podrinje region |
E440831
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Lower Podrinje |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lower Podrinje | Statement: [Podrinje region, hasPart, Lower Podrinje]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Lower Podrinje Context triple: [Podrinje region, hasPart, Lower Podrinje]
-
A.
Podrinje
chosen
Podrinje is a historical region along the Drina River, spanning parts of western Serbia and eastern Bosnia and Herzegovina.
-
B.
Pazinčica River
The Pazinčica River is a small karst river in central Istria, Croatia, known for forming the dramatic Pazin Cave sinkhole near the town of Pazin.
-
C.
Moravica
Moravica is a river in central Serbia that serves as a significant left-bank tributary of the West Morava.
-
D.
Gračanka River
The Gračanka River is a small watercourse in central Croatia that flows through the town of Gračanica and its surrounding area.
-
E.
Morača River
The Morača River is a major river in Montenegro that flows through the capital city of Podgorica before emptying into Lake Skadar.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9e940b081908b862bb0e6e89b0d |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e4704626308190bbdd98d27beb3f24 |
completed | April 19, 2026, 6:03 a.m. |
Created at: April 10, 2026, 10:02 a.m.