Triple

T17675944
Position Surface form Disambiguated ID Type / Status
Subject ruby-build E440643 entity
Predicate instanceOf P0 FINISHED
Object version management plugin C15650 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: version management plugin
Context triple: [ruby-build, instanceOf, version management plugin]
  • A. Ruby version manager chosen
    A Ruby version manager is a tool that lets developers install, switch between, and manage multiple Ruby interpreter versions and gemsets on the same system.
  • B. tag management system
    A tag management system is a platform that enables users to centrally create, deploy, and manage tracking tags and scripts on digital properties without requiring direct code changes.
  • C. software release model
    A software release model is a conceptual framework that defines how, when, and in what form software versions are planned, built, tested, and delivered to users over time.
  • D. Git interface
    A Git interface is a tool or abstraction layer that allows users to interact with Git repositories—performing operations like committing, branching, merging, and syncing—through a more accessible command-line, graphical, or programmatic environment.
  • E. software release
    A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9e940b081908b862bb0e6e89b0d completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10 a.m.