Triple
T17671007
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mula Dam |
E440519
|
entity |
| Predicate | hasReservoir |
P1025
|
FINISHED |
| Object | Mula Reservoir |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mula Reservoir | Statement: [Mula Dam, hasReservoir, Mula Reservoir]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mula Reservoir Context triple: [Mula Dam, hasReservoir, Mula Reservoir]
-
A.
Mula Reservoir
chosen
Mula Reservoir is a major artificial lake in Maharashtra, India, created by the Mula Dam for irrigation, drinking water supply, and other regional needs.
-
B.
Irganai Reservoir
Irganai Reservoir is a large artificial lake in Dagestan, Russia, created by the Irganai Dam on the Sulak River for hydroelectric power generation and water management.
-
C.
Rozkoš Reservoir
Rozkoš Reservoir is a large artificial lake in the Hradec Králové Region of the Czech Republic, used for flood control, recreation, and water sports.
-
D.
Mălaia Reservoir
Mălaia Reservoir is an artificial lake on the Lotru River in Romania, used primarily for hydroelectric power generation and water management.
-
E.
Boundary Reservoir
Boundary Reservoir is a man-made lake on the Pend Oreille River in northeastern Washington State, created by the construction of Boundary Dam for hydroelectric power generation and recreation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9e87e18819087104a44dc4dc5b1 |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e46f68a038819084828ff73bcf1fcc |
completed | April 19, 2026, 6 a.m. |
Created at: April 10, 2026, 9:59 a.m.