Triple

T17671007
Position Surface form Disambiguated ID Type / Status
Subject Mula Dam E440519 entity
Predicate hasReservoir P1025 FINISHED
Object Mula Reservoir NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mula Reservoir | Statement: [Mula Dam, hasReservoir, Mula Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mula Reservoir
Context triple: [Mula Dam, hasReservoir, Mula Reservoir]
  • A. Mula Reservoir chosen
    Mula Reservoir is a major artificial lake in Maharashtra, India, created by the Mula Dam for irrigation, drinking water supply, and other regional needs.
  • B. Irganai Reservoir
    Irganai Reservoir is a large artificial lake in Dagestan, Russia, created by the Irganai Dam on the Sulak River for hydroelectric power generation and water management.
  • C. Rozkoš Reservoir
    Rozkoš Reservoir is a large artificial lake in the Hradec Králové Region of the Czech Republic, used for flood control, recreation, and water sports.
  • D. Mălaia Reservoir
    Mălaia Reservoir is an artificial lake on the Lotru River in Romania, used primarily for hydroelectric power generation and water management.
  • E. Boundary Reservoir
    Boundary Reservoir is a man-made lake on the Pend Oreille River in northeastern Washington State, created by the construction of Boundary Dam for hydroelectric power generation and recreation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9e87e18819087104a44dc4dc5b1 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e46f68a038819084828ff73bcf1fcc completed April 19, 2026, 6 a.m.
Created at: April 10, 2026, 9:59 a.m.