Triple

T17625245
Position Surface form Disambiguated ID Type / Status
Subject Porsuk River E429823 entity
Predicate hasPart P35 FINISHED
Object Porsuk Dam
Porsuk Dam is a major Turkish dam built on the Porsuk River, primarily used for water supply, irrigation, and flood control in the Eskişehir region.
E1279219 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Porsuk Dam | Statement: [Porsuk River, hasPart, Porsuk Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Porsuk Dam
Context triple: [Porsuk River, hasPart, Porsuk Dam]
  • A. Gotvand Dam
    Gotvand Dam is a major rock-fill embankment dam in southwestern Iran, built on the Karun River for hydroelectric power generation, irrigation, and water regulation.
  • B. Rappbode Dam
    Rappbode Dam is a large concrete dam in the Harz Mountains of Germany, known for forming the country’s largest drinking water reservoir and for its surrounding recreational area.
  • C. Vidraru Dam
    Vidraru Dam is a major hydroelectric dam on the Argeș River in Romania, known for its impressive arch design and scenic location in the Făgăraș Mountains.
  • D. Koronowo Dam
    Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
  • E. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Porsuk Dam
Triple: [Porsuk River, hasPart, Porsuk Dam]
Generated description
Porsuk Dam is a major Turkish dam built on the Porsuk River, primarily used for water supply, irrigation, and flood control in the Eskişehir region.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Porsuk Dam
Target entity description: Porsuk Dam is a major Turkish dam built on the Porsuk River, primarily used for water supply, irrigation, and flood control in the Eskişehir region.
  • A. Gotvand Dam
    Gotvand Dam is a major rock-fill embankment dam in southwestern Iran, built on the Karun River for hydroelectric power generation, irrigation, and water regulation.
  • B. Rappbode Dam
    Rappbode Dam is a large concrete dam in the Harz Mountains of Germany, known for forming the country’s largest drinking water reservoir and for its surrounding recreational area.
  • C. Vidraru Dam
    Vidraru Dam is a major hydroelectric dam on the Argeș River in Romania, known for its impressive arch design and scenic location in the Făgăraș Mountains.
  • D. Koronowo Dam
    Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
  • E. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dbc62e88190b9757dc7c52d7fee completed April 19, 2026, 5:53 a.m.
NED1 Entity disambiguation (via context triple) batch_6a020a991e6881909ce905419e645a6a completed May 11, 2026, 4:58 p.m.
NEDg Description generation batch_6a020c10d1bc81909b0f04337df36be8 completed May 11, 2026, 5:04 p.m.
NED2 Entity disambiguation (via description) batch_6a020cefce4c8190a92f543533e4b801 completed May 11, 2026, 5:08 p.m.
Created at: April 10, 2026, 5:52 a.m.