Triple

T17616206
Position Surface form Disambiguated ID Type / Status
Subject STS-130 E429088 entity
Predicate dockedTo P14974 FINISHED
Object ISS Node 2 Harmony NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ISS Node 2 Harmony | Statement: [STS-130, dockedTo, ISS Node 2 Harmony]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ISS Node 2 Harmony
Context triple: [STS-130, dockedTo, ISS Node 2 Harmony]
  • A. Orbital CRS-1
    Orbital CRS-1 was the first operational Commercial Resupply Services mission by Orbital Sciences Corporation to deliver cargo to the International Space Station using its Cygnus spacecraft.
  • B. ISS Node 1
    ISS Node 1 is the first U.S.-built connecting module of the International Space Station, serving as a central hub that links multiple laboratory and living modules.
  • C. ISS ExPRESS Logistics Carrier 2
    ISS ExPRESS Logistics Carrier 2 is an external payload platform on the International Space Station used to host and support various scientific instruments and experiments.
  • D. Columbus Laboratory Module
    The Columbus Laboratory Module is the European Space Agency’s primary research laboratory attached to the International Space Station, designed for a wide range of microgravity science experiments.
  • E. Leonardo Permanent Multipurpose Module
    The Leonardo Permanent Multipurpose Module is a repurposed Italian-built cargo module attached to the International Space Station to provide long-term storage and workspace.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: ISS Node 2 Harmony
Target entity description: ISS Node 2 Harmony is a U.S.-built connecting module on the International Space Station that serves as a central hub linking multiple laboratories and living/work areas.
  • A. Orbital CRS-1
    Orbital CRS-1 was the first operational Commercial Resupply Services mission by Orbital Sciences Corporation to deliver cargo to the International Space Station using its Cygnus spacecraft.
  • B. ISS Node 1
    ISS Node 1 is the first U.S.-built connecting module of the International Space Station, serving as a central hub that links multiple laboratory and living modules.
  • C. ISS ExPRESS Logistics Carrier 2
    ISS ExPRESS Logistics Carrier 2 is an external payload platform on the International Space Station used to host and support various scientific instruments and experiments.
  • D. Columbus Laboratory Module
    The Columbus Laboratory Module is the European Space Agency’s primary research laboratory attached to the International Space Station, designed for a wide range of microgravity science experiments.
  • E. Leonardo Permanent Multipurpose Module
    The Leonardo Permanent Multipurpose Module is a repurposed Italian-built cargo module attached to the International Space Station to provide long-term storage and workspace.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e1c6148190ba76241e74688f8b completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46d32991c81909801161b0a416c94 completed April 19, 2026, 5:50 a.m.
Created at: April 10, 2026, 5:51 a.m.