Triple

T175780
Position Surface form Disambiguated ID Type / Status
Subject Reorganization Plan No. 4 of 1970 E3571 entity
Predicate instanceOf P0 FINISHED
Object United States presidential reorganization plan C3915 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: United States presidential reorganization plan
Context triple: [Reorganization Plan No. 4 of 1970, instanceOf, United States presidential reorganization plan]
  • A. executive order
    An executive order is a formal directive issued by a head of the executive branch, such as a president or governor, that manages operations of the government and has the force of law within the scope of existing statutory or constitutional authority.
  • B. Act of Congress
    An Act of Congress is a formal law or statute enacted by the United States Congress and, typically upon receiving the President’s signature or a veto override, becomes legally binding federal legislation.
  • C. presidential proclamation
    A presidential proclamation is an official, formal public announcement issued by the President that declares, recognizes, or directs specific actions or observances under the authority of existing law or constitutional powers.
  • D. federal government
    The federal government is the central governing authority of a nation that holds supreme power over national affairs, such as defense, foreign policy, and regulation of interstate matters, while sharing sovereignty with regional or state governments.
  • E. national government
    A national government is the central authority of a sovereign state responsible for creating and enforcing laws, managing public policy, and representing the nation domestically and internationally.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25374990081909766d30c79a18e0e completed Feb. 28, 2026, 2:31 a.m.
Created at: Feb. 28, 2026, 2:39 a.m.