Triple

T17567766
Position Surface form Disambiguated ID Type / Status
Subject San Antonio park system E427860 entity
Predicate includes P1393 FINISHED
Object Howard W. Peak Greenway Trails System NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Howard W. Peak Greenway Trails System | Statement: [San Antonio park system, includes, Howard W. Peak Greenway Trails System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Howard W. Peak Greenway Trails System
Context triple: [San Antonio park system, includes, Howard W. Peak Greenway Trails System]
  • A. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • B. Sam Merrill Trail
    The Sam Merrill Trail is a popular hiking route in the San Gabriel Mountains of Southern California that climbs from the foothills above Pasadena to the historic Echo Mountain and the ruins of the old Echo Mountain House and Mount Lowe Railway.
  • C. Greeneway Trail
    Greeneway Trail is a popular multi-use recreational path in North Augusta, South Carolina, known for its scenic riverside views and opportunities for walking, running, and cycling.
  • D. Don Valley Trail system
    The Don Valley Trail system is a network of multi-use recreational paths in Toronto that follows the Don River through its ravine, popular for walking, running, and cycling.
  • E. Greenway Trail
    Greenway Trail is a popular hiking and multi-use path within Seneca Creek State Park in Maryland, known for its scenic woodland and creekside views.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Howard W. Peak Greenway Trails System
Target entity description: The Howard W. Peak Greenway Trails System is a network of paved, multi-use recreational trails that follow creekways throughout San Antonio, providing extensive opportunities for walking, running, and cycling while connecting parks and neighborhoods across the city.
  • A. Leon Creek Greenway chosen
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • B. Sam Merrill Trail
    The Sam Merrill Trail is a popular hiking route in the San Gabriel Mountains of Southern California that climbs from the foothills above Pasadena to the historic Echo Mountain and the ruins of the old Echo Mountain House and Mount Lowe Railway.
  • C. Greeneway Trail
    Greeneway Trail is a popular multi-use recreational path in North Augusta, South Carolina, known for its scenic riverside views and opportunities for walking, running, and cycling.
  • D. Don Valley Trail system
    The Don Valley Trail system is a network of multi-use recreational paths in Toronto that follows the Don River through its ravine, popular for walking, running, and cycling.
  • E. Greenway Trail
    Greenway Trail is a popular hiking and multi-use path within Seneca Creek State Park in Maryland, known for its scenic woodland and creekside views.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e0385081908a04b66f4dd4bd0d completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e4592e56e481909249b831cecc31d5 completed April 19, 2026, 4:25 a.m.
Created at: April 10, 2026, 5:50 a.m.