Triple
T17567765
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Antonio park system |
E427860
|
entity |
| Predicate | includes |
P1393
|
FINISHED |
| Object | Medina River Greenway |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Medina River Greenway | Statement: [San Antonio park system, includes, Medina River Greenway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Medina River Greenway Context triple: [San Antonio park system, includes, Medina River Greenway]
-
A.
Leon Creek Greenway
Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
-
B.
Salado Creek Greenway
Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
-
C.
East Lake Greenway
East Lake Greenway is a scenic recreational trail and park system encircling Wuhan’s East Lake, popular for walking, cycling, and enjoying lakeside views and greenery.
-
D.
Pistol Creek Greenway
Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
-
E.
Camp Creek Greenway
Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Medina River Greenway Target entity description: Medina River Greenway is a scenic multi-use trail and natural corridor along the Medina River in San Antonio, offering hiking, biking, and wildlife viewing in a preserved riparian landscape.
-
A.
Leon Creek Greenway
Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
-
B.
Salado Creek Greenway
Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
-
C.
East Lake Greenway
East Lake Greenway is a scenic recreational trail and park system encircling Wuhan’s East Lake, popular for walking, cycling, and enjoying lakeside views and greenery.
-
D.
Pistol Creek Greenway
Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
-
E.
Camp Creek Greenway
Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e0385081908a04b66f4dd4bd0d |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e4592e56e481909249b831cecc31d5 |
completed | April 19, 2026, 4:25 a.m. |
Created at: April 10, 2026, 5:50 a.m.