Triple

T17567765
Position Surface form Disambiguated ID Type / Status
Subject San Antonio park system E427860 entity
Predicate includes P1393 FINISHED
Object Medina River Greenway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Medina River Greenway | Statement: [San Antonio park system, includes, Medina River Greenway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Medina River Greenway
Context triple: [San Antonio park system, includes, Medina River Greenway]
  • A. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • B. Salado Creek Greenway
    Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
  • C. East Lake Greenway
    East Lake Greenway is a scenic recreational trail and park system encircling Wuhan’s East Lake, popular for walking, cycling, and enjoying lakeside views and greenery.
  • D. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • E. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Medina River Greenway
Target entity description: Medina River Greenway is a scenic multi-use trail and natural corridor along the Medina River in San Antonio, offering hiking, biking, and wildlife viewing in a preserved riparian landscape.
  • A. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • B. Salado Creek Greenway
    Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
  • C. East Lake Greenway
    East Lake Greenway is a scenic recreational trail and park system encircling Wuhan’s East Lake, popular for walking, cycling, and enjoying lakeside views and greenery.
  • D. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • E. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e0385081908a04b66f4dd4bd0d completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e4592e56e481909249b831cecc31d5 completed April 19, 2026, 4:25 a.m.
Created at: April 10, 2026, 5:50 a.m.